
Friday, 17 October 2003

We arrived at Kenlake at 4:00PM and installed the new chain anchor rode. Stripes were painted every 30 feet so we can tell how much rode is out and stop before the end is ripped out of the boat and into the water losing both the anchor and the rode. Rick Nance, our master mechanic came by and explained all the work he had done to prepare the Katy Leigh for the trip. In particular he pointed out how I had been overfilling the oil in the injection pump for the past 4 years.

Submit Your Comment
Posted on 10/17/2003 10:03 PM by Bob Duthie
Comments
No comments yet.
Shopping Cart
Your cart is empty |